SOURCE IS CHINESE INTERNET:
In August 2008 it was reported that 611 Institute was selected to be the main contractor for the development of the fifth-generation stealthy J-20, and that 601 Institute was the sub-contractor.
Now 611 Institute has started to issue manufacturing drawings for constructing the first prototype, which is expected to fly by 2011.
Now 611 Institute has started to issue manufacturing drawings for constructing the first prototype, which is expected to fly by 2011.
The only Russian input is AL-31F Engine for prototype which is replaced by WS-15 Chinese Engine in serial production.
The latest news suggested first Chengdu J-20 Fifth Generation Fighter had been built at CAC.
The latest news suggested first Chengdu J-20 Fifth Generation Fighter had been built at CAC.